What did we do?

The project was undertaken in May 2012 to look at a wide range of pieces of work equipment that were going to be moved to the Derby operation.

The assessments covered a wide range of work equipment including:

  • Power presses;
  • Stretch formers;
  • Guillotines;
  • Lathes;
  • Milling machines;
  • Grinders;
  • Spray paint booths;
  • Ovens;
  • And a wide range of other equipment.

The work included the provision of 105 PUWER assessments and a detailed covering report to ensure a clear overview of the findings was available to management.